Case study:
From Blast Damage to Load-Ready:
A Smarter Access Solution for Heavy Haul Operations
When a routine rockfall protection job turned into an urgent infrastructure redesign, GeoStabilization International (GSI) and Access Limited rose to the challenge—delivering a load-ready access solution in just 18 days.
In this new case study, see how a switch from a bridge to a Geosynthetically Confined Soil (GCS) wall helped a major aggregate mine avoid delays, minimize costs, and safely support 70-ton haul truck operations.
Key Takeaways:
Whether you're facing site constraints, budget limits, or evolving ground conditions, this story shows how fast, flexible engineering can keep your critical infrastructure projects on track.